Home icon

Amazon EBS now supports additional resource-level permissions for copying EBS snapshots

News



Amazon EBS has introduced enhanced resource-level permissions for copying EBS snapshots, providing more granular control over snapshot copying across regions and accounts.

  • Users can now copy snapshots they own or have been shared with them
  • Six EC2-specific condition keys are now available for CopySnapshot actions:
    • ec2:Encrypted
    • ec2:VolumeSize
    • ec2:Owner
    • ec2:ParentVolume
    • ec2:SnapshotTime
    • ec2:ParentSnapshot
  • Global condition keys can also be used for source snapshots
  • New permission model is available in all regions where EBS snapshots exist

This update provides more flexible and precise control over snapshot copying and IAM permissions.



Go to article

The AWS News Feed is currently looking for gold sponsors. If you want to support the AWS community and reach a large audience of AWS professionals, consider sponsoring the AWS News Feed.

Related articles

Apr 22
2025
Enhancing resource-level permissions for copying Amazon EBS snapshots
Jan 31
2025
Amazon EBS now supports additional resource-level permissions for creating EBS volumes from snapshots
Jan 31
2025
Enhancing resource-level permission for creating an Amazon EBS volume from a snapshot
Apr 2
2025
Reduce costs with customized delete protection for Amazon EBS Snapshots and EBS-backed AMIs

The AWS News Feed is currently looking for silver sponsors. If you want to support the AWS community and reach a large audience of AWS professionals, consider sponsoring the AWS News Feed.